BISSO Marine  
 

6 DLB BIG CHIEF

The 220’ x 74’ x 14’ DLB BIG CHIEF is a true combination derrick / laybarge equipped with a dynamically rated revolving derrick configured with both main and auxiliary blocks, 100 tons and 10 tons respectively. The DLB BIG CHIEF is outfitted with a seven point mooring system, capable of pulling 54 tons per winch drum. The mooring system is configured with 4,000' x 1.25" wire rope per drum and seven 14,000 lbs customized anchors. The barge is also configured with two 36” spud wells.

In pipeline mode, the DLB BIG CHIEF is configured to lay up to a 24" single pipeline or up to a triple 8" line. The barge is outfitted with two welding stalls and one x-ray stall. The adjustable 37' stinger can smoothly transition a pipeline to the seafloor at the beach or out in much deeper water. The DLB BIG CHIEF has a 50 kips tensioner, electric welding machines, two 1600 CFM compressors, three 6x6 Peerless jet pumps which supplies the stern hose reel which has 600’ of bundled air and jet hoses which feed the custom adjustable burial jetsled.

The DLB BIG CHIEF can be modified to recover damaged pipelines and trunklines of any diameter. The recovery method utilizes a BISSO MARINE designed and engineered "recovery line" which can provide up to 100 tons of force to pull a damaged line on to the deck. The recovery system accommodates both pigged and unpiggable “contaminated” pipelines which are fully contained inside a pollution containment area. The entire system is "cold" allowing dirty or "hot" lines to be safely recovered then disposed.

The large size of the DLB BIG CHIEF reduces weather downtime for customers thus enabling productive lay and burial operations in otherwise unworkable conditions. The large open deck of the DLB BIG CHIEF can accommodate over 25 miles of 6" pipe storage.

The barge has comfortable accommodations for 56 persons offering satellite communications, fax, data and television.

DLB BIG CHIEF SPEC SHEET

DLB BIG CHIEF laying and burying pipe simultaneously

 

DLB BIG CHIEF removing caissons in gulf of mexico

 

 

 

 

 

4 DERRICK BARGES

4 COMBO DERRICK LAY BARGES

4 PIPELAY BARGES

4 CRANE BARGES

4 MATERIAL BARGES

4 TUGS

4 DIVE SUPPORT VESSELS

4 SUPPORT VESSELS

4 SUPER JET PUMPS

4 HEAVY LIFT AIR ROLLERS

4 SUPPORT EQUIPMENT

 
 
Bisso Marine